top of page

PS20R | SCA Standalone Gym Annex

We are making great progress on the PS20R | SCA Standalone Gym Annex. Our team has already drilled and installed 44 ct. sixty foot piles, removed the general site excavation and soil. They are furthering the excavation for foundation grade beams and building slab and some of the backfill was performed. In addition, the rebar and formwork for outer perimeter grade beams were completed and the storm detention tank was installed. Great job team!

Construction at PS 20

Construction at PS 20 Aerial

bottom of page